This report covers the operations of the Nordic Optical Telescope for the period 2002-03-12 to 2002-09-17.
This report has a slightly different set-up from the previous reports. Specifically, I have tried to limit the report to the relevant changes that occurred during the period. The main part of the report dealing with operations is now divided in two parts; the first part looks at operations during the reporting period, and the second part looks at expected changes in the coming months.
A very significant part of this report was prepared with the help of
Amanda Kaas who was acting AiC until the 1 of August.
In the future I would like to fix the reporting periods to 6 months,
running parallel with the observing period: i.e. 1 of April to
30
of September; and 1
of October to 30
of
March. I also intend to provide more detailed statistics on technical
down-time and time lost due to weather, which should provide a better
idea of changes with time.