General overview

In Table 2 the number of faults and total time lost as a function of the system and kind of fault is presented together with the overall numbers for the previous period (33). Note that at the start of period 34 `FIES' has been added as option.



Table 2: Down-time statistics for period 34$^a$
Syst/Type Soft Elec Optics Mech Others Total P33
Telescope 20 01:55 3 00:05 0 $-$ 2 00:00 4 01:10 29 03:10 22 05:30
Building 0 $-$ 3 00:00 0 $-$ 1 00:00 1 00:00 5 00:00 8 02:00
Computers 14 03:55 2 00:00 0 $-$ 0 $-$ 2 00:00 18 03:55 22 01:30
ALFOSC 15 02:45 3 00:25 1 00:00 3 00:00 2 00:30 24 03:40 23 06:10
MOSCA 2 00:15 1 00:15 0 $-$ 2 00:30 0 $-$ 5 01:00 4 00:00
NOTCam 9 00:10 0 $-$ 0 $-$ 0 $-$ 0 $-$ 9 00:10 5 00:05
StanCam 5 00:15 0 $-$ 0 $-$ 1 00:00 1 00:30 7 00:45 1 00:20
FIES 3 00:55 1 00:30 0 $-$ 0 $-$ 0 $-$ 4 01:25 $-$ $-$
Others 1 00:00 5 00:00 1 00:00 1 00:00 8 00:05 16 00:05 10 00:00
Total 69 10:10 18 01:15 2 00:00 10 00:30 18 02:15 117 14:10 95 15:35
P33 50 07:30 26 05:55 4 00:00 11 02:05 4 00:05 95 15:35    
$^a$For each system-type category the total number of faults and total time lost are given

Thomas Augusteijn 2008-01-11