Semester P68: 20231001 - 20240401
Principal Investigator Peter Jonker
Programme Determining the origin of the elusive Fast X-ray Transients
Instrument ALFOSC
Time Allocation Follow-up on first 3 night of a trigger
Total Nights 0.2
Type ToO+SoftToO
Notes Override, but should aim for (soft) triggers during Nordic service or Technical nights
Total Time Spent 00:00 (hh:mm)
Proposal Date Time Type Targets Files Comments Status
68-302 2023-12-17 00:00 SoftToO SwiftJ050400+673405 ALGl170137 - ALGl170142 Failed
68-302 2023-12-18 00:00 ToO SwiftJ050400+673405 ALGl180111-122 bad seeing Failed
68-302 2023-12-19 00:00 ToO Failed
68-302 2023-12-21 00:00 ToO Could not observe the target due to failure to meet the seeing requirements, as the seeing was above 1 arcsec for all of the night. Failed

 

The above information is collected from the ToO/Mon reports that have been created by the observer.

Should any of the observations have been carried out using the OB system, you will find additional information HERE

Back to top Last modified: September 16 2024