Down Time

Tables 1 & 2 on the following pages distill all downtime recorded in end-of-night and end-of-run reports for the period 2000-09-18 to 2001-03-01.

  • Technical failures on scheduled observing nights: 32 hr ( tex2html_wrap_inline372 , assuming an average tex2html_wrap_inline374 hr night)
  • Technical failures on tech nights: 4 hr
  • Technical failures with visitor instruments: 6 hr

The major failures are associated with repeated building crashes arising from three possible independent sources:

  1. misalignment of the main hydrostatic bearing causing excessive friction and
  2. possible electronic noise in the building/telescope servo loop supplying incorrect data to the TCS.
  3. possible problems with the safety system.